Case Study: PM Electric

“It was such a good experience from a new customer point of view. Being that professional, responsive and thorough makes my job a whole lot easier.”

Anthony Sassine, PM Electrical

LinkedIn
Share
Post this article

This case study outlines our work with PM Electric in supporting the installation of a 2x 200kw and 2x 75kw UPS for a national Australian broadcaster.

View the case study

LinkedIn
Share
Post this article
Related news articles

Contact us

"*" indicates required fields

Hidden
This field is for validation purposes and should be left unchanged.